Good start!
Though there's a few stray pixels, especially around the sonar dome Not sure if the radars are up to date but I know little about them so don't take my word as gospel
Hmm, the drawing of the Standard Missile is an old drawing. Check the latest US weapon parts sheet for the newest drawing of the Standard Missile.
Thank you guys
I'll check on the missiles but as of yet I've only re-colored them.
I have some doubts......
I suppose this ship would sail on an spruance powerplant? you have removed the air intakes....
the size looks about right. the strike cruisers were often bigger, but an comparision between virginia and kidd show that nuke ships tend to be bigger.
what I have doubts about, would be the general arrangement. the superstructure seems to have little space for the intakes, and the radar arrangement seems less then ideal. the Mk 26 are mod 0, I suppose? otherwise the tomahawks are on top of the plenum vents.
I am also in doubt about that remodeled Mk 26, but I have voiced that earlier on and you are free to use whatever parts you want, so I'll keep it at that.
you have a lot less weight at the bottom due to the propulsion plant having a lower weight and, with the in and uptakes, an higher CoG. this might urge you to reduce topweight and thus make the current radar and weapon layout too heavy.
the SLQ-32 seems to be badly placed underneath the phalanx, and the platform would certainly need some structural support.
also, you may want to keep an eye on the project DX thread I am working on, for updated spruance drawings...... the propeller, helideck, air intake housing and uptakes for example have been updated on those and might look better on this ship too (if you want, PM me and I'll sent you the spruance 1975 WIP)
it is an interesting proposal though, although it might lack the firepower the strike cruisers had (they all had typhon or aegis, and especially in case of typhon nuclear power was needed or the system would lack power) so I think the reason for the strike cruisers not being build is a bit more complicated then just this.
and a last small remark: I suppose this is still WIP? otherwise I'd like to ask for crediting, as I see a lot of parts reused from other drawings.
Ace, can you look me straight in the face after seeing a Tico and tell me you think this ship to top heavy....
I tease of course, but tico'c HAVE to have added ballast wouldn't they? I'm sure the same thing could be done in this case. I like your DX and I wish you would post more pics. As for power plant yes, same as Spruance and Ticonderoga. I have been throwing an extra turbine to each engine room however. I will think about that later. Or perhaps I shall add the possibility to my back story. Yes the SLQ-32's are pushed out and on a platform under the CIWS. I lifted that from the Virginia class and I can tell you that this set-up works just fine. I thank you for pointing out the in-take set-up. I always just assumed intake was on the stack itself. I have added intakes although the front is hidden behind the CIWS. As for as credits, YES, This is very much WIP. As you will be able to tell here in a minute I am using most parts as place holders and re-drawing my own parts to replace them. Once finished I will credit properly. OH yeah, one more thing. What is Typhon? I've never heard of that. please send me a link
I appreciate your invaluable help Ace.
OK, now down to business. I feel I need to add to the backstory a little.....so without further adieu
*Alternate History*
As the Spruance Class was in research it was decided that a bigger ship would be built concurrently. The Planners and researchers concluded that a ship built as a cruiser was needed. They felt the Spruance was good as a destroyer but they wanted to build a ship that would replace the aging fleet of conventional cruisers. The first flight would be built with the current AAW suite but with an eye toward upgrade to the still in development Aegis Spy-1 system. All other systems were also to be built with and eye toward modularity. They were also to be equipped with the MK-71 MCLWG from the beginning, as the admirals wanted to renew the fleets GFS capabilities. The power plant on the first flight was to be the same as the Spruance class but with room to expand to a total of 6 main turbines as future weapons systems may require.
OK, I'll expand that as I think of anything else
so here is my latest up date. I've lengthened her a bit and lowered the ABL's to the main deck. I think the draft is to shallow as I just used my Leahy hull as a guide for this. I will fix that next go round
oh, also I as showing this ship at the moment with some future upgrades such as SAT domes and RHIB