Phase I refit-
The vessel's Phase I refit will improve the vessels service capability for about 10 years more. The vessels interior structure will be improved to provide more space to increase the vessels capability in holding more cargos and armaments.This refit will solve the vessels lightweight problem.
Phase II refit-
The mast can be replaced with the lighter and more reliable composite mast for holding the ships vital parts and radars. Aging propulsions can be replaced by a CODAG system. Replace the propellers with the controllable pitch ones and install a bow thruster to provide more maneuverability for the vessel.
Phase III refit-
The final refit will improve the vessel's armaments and radars. The 3"50 caliber guns will be replaced by the M242 25mm cannon while the front 3"50 will be replaced by a Oto Melara 76mm gun guided by a Mk.92 FCS. AN/SPS-67 surface search radar, sonars, and AN/SPS-49 air search radar will replace the aging radars.
Harpoon missile and a Mk13 twin arm launcher can be installed in the aft where once the depth charge racks were once placed. Mk13 is a reliable one and US retired this launchers and i hope they can give one to us.
This what PF-11 will look after refit