Naka as of 1938:
between february 5th 1937 and january 31st 1938 Naka underwent her second major refit, during the works the bridge structure was further modified ed expanded, foremast platforms where reworked and the mast itself shortened in height, two 1,5 meter rangefinders and two lookout platforms where added on both sides of the bridge, the four 90cm searchlights where replaced by three 110cm ones, the two on the mainmast replaced by a single one, the twin 13mm machine guns fitted abreast the n°2 funnel where replaced by 25mm ones, a 3,5 meter rangefinder tower was added between the third and fourt funnel, a unique feature of the Sendai class, finally an Aichi E11A floatplane replaced the Nakajima E4N.
there is no Aichi E11A yet, as i have to draw it first.