Moderator: Community Manager
[Post Reply] [*]  Page 6 of 24  [ 238 posts ]  Go to page « 14 5 6 7 824 »
Author Message
JSB
Post subject: Re: Finnish AU (Part III)Posted: February 20th, 2015, 4:50 pm
Offline
Posts: 1433
Joined: January 21st, 2014, 5:33 pm
Simply amazing standard, a realistic AU without any BBs in sight.


Top
[Profile] [Quote]
Hood
Post subject: Re: Finnish AU (Part III)Posted: February 21st, 2015, 9:20 am
Offline
Posts: 7233
Joined: July 31st, 2010, 10:07 am
This indeed an impressive AU, precisely because it is on a smaller scale with very plausible vessels and with constraints, both technical and financial.

_________________
Hood's Worklist
English Electric Canberra FD
Interwar RN Capital Ships
Super-Darings
Never-Were British Aircraft


Top
[Profile] [Quote]
eswube
Post subject: Re: Finnish AU (Part III)Posted: February 21st, 2015, 12:52 pm
Offline
Posts: 10696
Joined: June 15th, 2011, 8:31 am
Excellent additions and backstory! :)


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 1st, 2015, 12:44 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
The Gunboat revisited.

....Biggest obstacle was in the armament, And in 1966, after delegations send into Novgorod and Soviet Union resulted dim conclusion that no suitable automatic cannon was in sight to fit in the otherwise rather far headed planning parameters. It was then designed to revaluate the tactical-technical requirements and the operational concepts of the new vessels. The capacity to support army units at shore were dropped, as was the ability to contest with NATO cruiser size vessels, and therefore a 76mm range main aramament was choosen. As Novgorod didn't poses such weapon on its inventory, the Finnish naval desingers approached for Soviets and found the suitable twin mount for automatic 76mm cannons which were purchased then as new main armament of the fleet. This caused lot of discussion and heated fustration among the older generation of naval officers, but the planning progress was conducted by the shipyards and the political leadership of the naval staff without interference from the naval staff.

The gunboats were laid down in 1967 and completed in 1968 and 1969 respectively. Another pair followed 1970 and 1971 which gave the fleet four new fast corvette size vessels that were well suited in their role as leaders and flagships for the Small attack craft flotillas. These acquisitions allowed the Navy to decommission its old wartime escorts and escort-destroyers....

[excerpt from the bigger text block now edited]

After working a while with the newer ships I've run into set of trouples, setbacks and difficoulties considering the use of Novgorodian equipment for this AU. The proplems are mostly down to the naval artillery and the creation of the modern Novgorodian ordanance, way ahead its natural timeframe in my AU planning work. Since Novgorodians are still stuck at pre-dreadnought era in my work-schedule, I dont want to make any too binding decissions regarding its cold war fleet based on the requirements set by this Finnish AU. Therefore I have had to make the difficould decission and to drop the recently introduced A-217 fit from my Turunmaa class and revert back to the "old and reliable" Soviet Ak-726 turrets, with all the tactical shortfalls it creates but in same vain allows some "correctional moves" to be made in the fleet composition for the next 1975-1990 round that is coming together rather well currently. Once the main AU has reached these years, and if I've come to other conclusions in the artillery field, I propably resume to this issue to make it matching for that aspect. But as for now, I don't want my hands to be too tied. Finns are not that important :P

[ img ]

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Hood
Post subject: Re: Finnish AU (Part III)Posted: March 2nd, 2015, 8:38 am
Offline
Posts: 7233
Joined: July 31st, 2010, 10:07 am
I don't believe it! The Master of Redux is reduxing already! :lol:

Looks good though.

_________________
Hood's Worklist
English Electric Canberra FD
Interwar RN Capital Ships
Super-Darings
Never-Were British Aircraft


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 16th, 2015, 12:32 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
Sorry for a bit of delay, but this last pace of the combatants took bit of more time, thought I anticipated it would. Gathered in the mist of the artillery changes I allready posted, this selection will effectively complete this AU in its main set. Encores naturally will follow in terms of more obscure crafts such as auxillaries and Border Guard vessels, but I have to do more research and visionary work before I get there.

But first, bit of wall of text, the history

End of the Cold war 1970-1991

Off all planned economies, Finland managed its own perhaps with the most workable model, where the practical planning was rather decentralized into the “combinate” level, meaning that basicly into each branch of the industry or economical sector. The production planning and price policy was under the combinate control and method similar to that of socialistic workers self-management in Yugoslavia. These cyndicalist elements, influenced by Novgorodian models allowed lot more flexibility in Finnish economics which were not so prone to mismanagement and resource wasting as the Soviet central planned mode was. Private ownership through various cooperative schemes were mostly norm in service sector and in agriculture.
Despite Finland didn’t poses much of strategic resources for heavy industry, the economy in Finland continued to grow steadily on trough the 1970’s stagnation in the rest of the Soviet camp. It was not however similar level of growth that Novgorod enjoyed in afterward of the 1970’s energy crisis and newly developed oil and gas fields. Finnish economy was well tied to that of Novgorod, and Novgorod was the biggest trade partner with over 50 % share in both exports and imports. Main exports product outside of the Comecon countries were forestry products and specially paper, but also ships and specialized industrial products such as papermills. Among these Finland was also large exporter of agricultural and dairy goods to Novgorod, while almost all raw materials and oil consisted most of the imports. Due to Finnish special status as politically reliable ally allowed Finland lots of influence inside COMECON and Finland was able to import lot of raw materials and goods from other non-Soviet members with similar prices as Novgorod and Soviet Union could. Novgorod subsided Finnish production in some degree, mostly on favorable prices on highly specialized export products as well as giving long term loans on important infrastructure projects and defense spending.

Compared to the economic difficulties in Poland, DDR, Czechoslovakia and Hungary during the 1980’s and eventually in Soviet Union after Perestroika, Finland and Novgorod shared rather less turbulent progress during the last decade of the Cold War. The political upheaval that ensured in the late 1980’s wasn’t therefore that affective to Finnish society, and generally the party itself led the main speech in criticizing its own institutions and ineffectiveness in increasing fashion along the collapse of the communist rule in eastern Europe begun.

Biggest and most anticipated action in Finnish politics at that period was the retirement of the old power-duo of Sinisalo and Saarinen that eventually took place in 1990 at the XIV party congress of SKP, at the height of increased tension and dissident in Novgorodian Baltic. Arto Valtonen and Heli Petäjälaakso replaced them as party’s first secretary and president. The new regime initiated series of reforms in Gorbatsovs model, but was careful not to refer into anything that could have been seen as stepping down by the party itself. The economical projects included partially to allow foreign investments and privatization as well as attempt dismantling the large government combinates from their increased political status, which soon brought the new leaders odds with the industrial complex and the bureaucratic elite. The new regime soon found itself in odds with the Military by initiating cuts to the military expenditures.

In August 1991, Hardliners in Moscow organized coup against Gorbatsev. Soviet Union itself was crumbling under the weigth of its political changes and rather badly managed economical renovation process. In Finland, similar “August group” begun to organizing itself around Matti Mäki (Sinisalo’s political Secretary) and General Mattila, the Commander of Finnish People’s Army. Closely following the situation in Soviet Union, and Novgorod the Finnish regime hesitated in many decisive actions and popular dissent begun to grow, to which the Interior Deputy, Aimo Ventilä, part of the “August group” issued unilateral actions to increase police presence in streets and issuing curfew in major cities in Finland. These caused even more friction inside the government and as the political leadership remained indecisive, the popular atmosphere begun to spread with fear of internal upheaval and coup. First time large scale demonstrations spread into Helsinki and other bigger cities as spontaneous repeat of the actions that had took place in Eastern Europe few years back. Inside the regime, fierce struggle had begun from the loyalty of the military and police, and despite Deputy Venttilä was sacked from the government, the reformist were unable to find loyal replacements as the August group begun pressure military officials not taking political administration roles unless several issues inside the defense policy and military economy was solved.
Like the August group had anticipated many rejected this sort of political motivated process and withdrawn completely from the decision making, and the remaining was mostly pro-hard liners and followed the conspiracy’s lead. In face of political crisis, an emergency party meeting was called in early September but it resolved after the whole central committee was given no confidence motion by the party congress. This lead to resigning of the Valtonen and Petäjäsola, but after the former gave public speech to claim the events as coup and assuring people to gather in the streets, she was arrested and martial law was imposed to whole nation and the August fraction begun to move to power. The Central committee did not however resign and since the August fraction had not numerical superiority in its seats nor courage or will to resist the almost sacred institution of whole communist hierarchy, a stalemate ensured and the government, central committee and increased amount of prolific members of the reformists as well as the August factionists entered into negotiations in Hotel Torni in Helsinki for almost three weeks. After these negotiations, it was planned to establish a “National salvation committee of Finnish socialism” to work as internment government and to establish Finnish People’s Democratic Alliance (Suomen Kansan demokraattinen liitto, SKDL), that would include The Communist Party as well as any other organization to be allowed to participate in the parliament elections that were scheduled in early 1992. This was largely seen as compromise to avoid full confrontation between the reformists and the hard liners and to stabilize the nation and allow more moderate and controlled reforms in the political and economic System.

In the end, Communist Party managed to keep majority inside the SKDL and Matti Mäki was elected as the General Secretary of the Party. The Presidency position was “given” to the reformist and was first given to Mauno Koivisto in 1992-1994, then followed by Martti Ahtisaari 1994-1999 and currently held By Tarja Halonen, all of them being former foreign deputies of Finland.


1991-2008

Much of the post-cold war reforms in Finland constituted on the civil rights and liberty fields. These allowed creation of at least semi-democratic establishment on the politics when new parties independent from the Communist party were allowed to operate under the SKDL’s umbrella in the parliament and most importantly in the local communal elections and councils. Voting system was changed so that there actually was a choice of more candidates than actual seats. Most important of the new political forces were the Green movement and the lack of environmental conscience in the old regime’s economic policies grew lot of attention and allowed initiate lot of reforms in regarding the old pollution-prone industry and power supply. Much of this criticism was directed to industrial combinates, which had managed to retain their status in the power echelons of the “new” People’s Republic as the government trendily called itself.

The end of the Cold War opened markets from both Finnish exports to Europe as well for Western investments inside Finland, though the most efforts to establish foreign companies were hampered by the still socialistic legislation about workers’ rights and self-management, the economy if Finland begun slowly rise after the mid 90’s. The major goal for Finnish leadership was to create Finnish Mark to be internationally exchangeable currency. This was tried on 1992, and 1996 in all cases it leading into rabid inflation that hampered the recovering economy. Biggest growth in Finnish economy started in telecommunication field, when the Finnish communication technology combinate and its Nokia brand begun to gain international sales after the Finnish advances in mobile phone technology were key targets for foreign investments and accelerated the growth in technological industry. Finland had already maintained limited national wide mobile phone network in the 1980s for government and military usage exploiting the espionage conducted on the Swedish NMT network. Finland became one of the key technological contributors in creating GSM network technology and Nokia was one of the first successful mobile phone brands internationally and did great work in polishing the Finnish public image internationally.
Success in telecommunication technology field encouraged the political leadership to allow more foreign investments in other high-technology branches and the relatively high standard of Finnish technical universities and education provide many European companies affordable high-skilled workforce. In down effect of this boom was lot of emigration of the skilled workforce to Europe for better living standards and salaries.

[the post cold war history is intentionally bit vague. If I came up some more exiting scenarios during the main phase of this AU worldbuilding, Ill return to it in here too]

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 16th, 2015, 12:36 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
Naval developments in late Cold War (1975-1990) and the 1975 Fleet Act

In November 1975 Finnish People’s navy faced its most severe peace time disaster when the Training Ship Aunus was sunk at heavy storm in the Barents Sea, outside Murmansk with all hands. This tragedy caused national wide shock and many recall the echoes of the 1905 war and saw Finnish navy once again sailing far abroad and causing embarrassment for the nation. But most importantly, in the political leadership, it was seen that the People’s Navy, the vanguard of the Finnish Defense forces was coming obsolete and poorly matching the requirements of today. Despite blaming such was bit farfetched in light of single maritime tragedy, especially as it lead the early retirement of the Navy’s high commanding officers, there were other, non-public issues going around in the same time that put enormous pressure on the Naval leadership and to the leadership of the entire military establishment.

In 1973 Novogorod held its Taifun war-games in the Baltic that included large scale amphibious exercises and general planning of Warsaw Pact war strategy in Baltic. Its operational goals dictated a rather adventurous plan where the Finnish contingent, consisting the amphibious forces and their escorts. Because of rather obscure planning phase done by Ground forces Generals and politicians, it was decided that the Finnish forces would use their own waters as initial grouping and Support area and move from there to the actual landing sites in Northern Poland. Similarly, Polish and GDR forces would use their own basins for such. In the actual Novgorodian composed Warsaw Pact War plans for Baltic, it was decided that Finnish forces would be used in more close proximity of their home waters, such as invading Swedish mainland or recapturing the Ahvenanmaa or Estonian islands, and Polish and GDR forces would attack the more strategically important Danish straits and Gotland. But because of political will to show massive joint landings to be filmed for propaganda purposes, the military planners decide to concentrate all landing activity into single operation. This proved not to be problem for the Southern member states, nor to Novgorodians who were lot better prepared for offshore deployments, in Finnish part it became problems since the inherent bureaucracy in Finnish Naval HQ resulted the war games to be used simultaneously to test and practice the actual Finnish war plans and doctrines which called heavy force distribution in the archipelago and mandated that all Finnish naval units would be based there. Despite the army staff did not see problems in the long sea march from Turku to Poland, the reality soon interrupted and after series of misfortunate maintenance problems, bad weather and poor troop habitability turned most of the participating 6 landing ships to return their port, or seek cover in Novgorodian Baltic coast, and in the end only 1 troop ship joined the combined naval task force. This was seen as great humiliation for the Finns and source of lot of Novgorodian oversight for Finland once again ruining joint allied naval operations. Many captain lost their position in following purges and in 1974, when only a naval staff’s conducted cardboard model wargames, Finnish naval units were not counted in for the amphibious role.

After the political fallout was settled, the Taifun fiasco caused deep analyses over the overall war capacity of the Finnish navy, by both internally, and then more superficially by the Finnish delegation in the Warsaw Pact combined supreme command. It was mainly observed that the Finnish made landing ships lacked the endurance required for long term deployments, the crews were not trained for long sea transfers, the ships engines were not economical for such use mostly because they were chosen with domestic production as paramount criteria. Also, the naval infantry were not trained and “hardened” themselves to spend long times trapped in the narrow vehicle decks of the rather archaic landing ships, and finally it was seen that the new fast gun boats were not ideal escorting such fleet for long distances. A committee was establish to overcome these faults and mistakes in the previous naval program, and it drafted a new plans for the fleet composition and for the building programs for the following decades. Since lots of new ship types were envisioned that were not able to comfort or modify from the existing vessels or production lines, a new naval program was suggested. This plan was left for the Central Committee in early 1975, and after the disaster of Aunus, the plan was quickly handled and got Parliament approval in the same year.

The main thesis of the program was to increase the distances and reach of the Finnish Navy, as well as its flexibility to conduct its share in the maritime theater in the Baltics during the general war, and overtaking the problems that plagued vessels that were acquired during the last planning period. Despite many foreign analyzes has often emphasis this new program and its rather grandiose achievements as desire for a blue water navy, The Finnish plans were never set for operations outside the Baltic sea.

Its biggest element and switch of concepts came in destroyers, as the old and rather small gun armed ships from early 50’s vintage were becoming obsolete and to be replaced. Originally it was planned to replace them with more Turunmaa class gunboats, but after the studies and experiences showed the types lack of endurance and seakeeping insufficient for Baltic range operations, a lot larger vessel was envisioned. It would be mostly intended to escort the Finnish landing ships, and cover their landing operations as well as provide escort for the sea based supply routes established during the war and also lead the smaller Finnish ships in more traditional sea denial operations. Also, it was mentioned that ships should have considerable margin and stability to support the demands of the alliance fleet operations in all aspects. This meant basically that the ships were demanded to be able to conduct all possible roles and purposes Novgorodian decided to give for its small allies in the Baltic, most prominently the participation of the joint task forces of escort vessels that trained with the Novgorodian Northern Fleet units in the Atlantic and North Sea. Secretly it was decided that the new “escorts” as they were then called would be ocean going vessels that would not sink from smallest storms nor remain inferior to the average opponents to cause any more humiliations for the Fleet in what it came to the foreign deployments.

After the design studies were concluded, it foresaw large ships of almost 1,500 tons armed with Air Defense missiles and naval artillery and would field surveillance radar equipment and medium frequency sonar as well as modern Anti-submarine ordnance. Such new capacities included in a new vessels with clear prestige value, it was decided that possible foreign assistance from Finnish allies would be needed in design and building work. After tenders were sent for Novgorodian yards, it became apparent that no such vessels were in production nor in planning state that could fit the Finnish requirements. As it was becoming typical, Novgorodian shipbuilding complex served prioritized to the Novgorodian vast ocean going fleet and its needs and most of the time vessels intended to operate in confined waters were several times larger than units fulfilling similar role in Finnish service. Thus the missile attack crafts Finland sought to acquire from abroad, were purchased from Soviet Union, which did place emphasis in small tonnage. Similar role Novgorodian units would have been corvettes of over 500 ton displacement. As for escorts, Novgorodian own fleet units were close to 3,000 tons, and were equipped with Anti-submarine missile systems and advanced sonars which Novgorod refused to export and which were not suited into the shallow Baltic where ASW operations had always been source of great difficulties.

It was not therefore surprise that the Soviet Union once again “won” this Finnish bidding, as after visiting the Nikolayev yards in the Black Sea, Soviets offered their Project 1159 class guard ships, which were specially designed for export for smaller navies replacing vessels of similar vintage as the old Uusimaa class destroyers. They covered pretty much all of the Finnish original requirements, par the propulsion side, which Finns originally insisted to be full diesels. The Pr. 1159 class featured similar CODOG arrangement that the Turunmaa class did, minus the diffusion propellers. After series of negotiations, Soviets allowed Finland to purchase the production plans to this class and after modifications by the Valmet Yard in Helsinki, three hulls were ordered from 1977 onwards and completed by 1983. They differed from the Soviet build examples serving in the Baltic in German colors by fielding larger bridges, lattice masts and in place of the Soviet OSA-M model SAM system, the Novgorodian PIRAMID was fitted with similar dimensions, as the system was also selected for ground force service. They also had the Novgorodian Kreposit back-to-back surveillance radar usually associated with the Piramid SAM system.
They were named after the Finnish communist party leaders and classified as “Saattaja” meaning escorts, whereas the Soviet Designation would have been SKR, a Guard Ship, the Novgorodian one as MEK, a small escort ship and the East German near sisters were called KSS or 1st class Coastal Defense ships.
They were successful vessels and with their close range air defense missiles, they mostly served as battle group leaders, mostly those of anti-submarine role, and it was originally planned to build two more armed with anti-ship missiles, but these plans were not implemented. They also participated in the joint Warsaw pact training cruises and the first two, Otto W. Kuusinen and Yrjö Sirola escorted the Finnish landing ships that took part in the 1981 “Zapad” war-games in Poland.

Second big investment came naturally in the submarine production, as it was apparent that even the relatively new M-class boats were inferior to latest Swedish and West-German boats and the technological gap was widening in alarming pace. Finnish submarines had conducted secret training missions alongside with the Novgorodian boats in the Gotland basin in the early 1970’s that showed the deficiencies of the older generation diesel boats in face of modern ASW equipment. A design study was started for creating completely new generation of Diesel submarines suited for Baltic operations and especially in the confined Finnish waters. Whereas there had been success of obtaining foreign products for the escort ships, it was soon found out that neither Soviet Union nor Novgorod were interested of producing small submarines, and the latest Soviet model, Pr.877, specially intended for export and for coastal operations, were almost 3,000 ton “leviathans” as the Finnish evaluation study described and completely unsuitable for the tactical requirements that the Finnish fleet insisted. Novogorodian vessels were equally large and despite this size vessels offered capacities to operate in the whole of Baltic, such role was not envisioned for the Finnish boats.

Technical assistance and incorporating the innovative design features of these type of boats were however accepted and the new Finnish boats were planned to be “scaled” down version of the tear-drop hulled and single shaft general layout. An 800 ton design tonnage limit was set and the prototype was completed in 1983. As the new generation diesel-electric propulsion (a Novgorodian one was chosen) was designed for much larger vessels, fitting them into the Finnish boat demanded rather peculiar solutions and thus the rear compartment has the distinguished “hunchback” form. Whether this affected the desired hydrodynamic features is not known nor revealed. The lead ship Iku-Turso completed her trials in 1985 and was commissioned into the naval service and the series production begun to replace both the Ahti and Vetehinen class vessels. They featured the latest Novgorodian made sonars and computerized fire control and caused great alarm among the NATO planners in Baltic that were rather accustomed for the mediocre performances of the older Finnish boats. 10 boats were originally planned but the construction was severely slowed down in the early 1990’s when the political upheaval and the end of Cold War slowed all military production, and only 6 were eventually build.

Biggest political need for the new naval program was to improve the amphibious capacity of the Fleet. As the humiliating events of the 1973 war-games showed, the Fleet needed longer range vessels that would be larger and have accommodation onboard for the troops it was to carry. After foreign designs were once again evaluated, it was decided to build and design the ships domestically, although East German Pr.108 was chosen as the basis of the design work. The Finnish vessels were altered from the original layout so that they had more modern self-defense armament, a helicopter deck and they lacked the shore bombardment rocket launchers, and the space reserved for them in the East German ships were used for more cabin space. A dedicated fire-support/command ship version was planned to be built on the same hull, but never materialized. It would have fielded the RLs in the place of the vehicle deck, and extensive command and HQ facilities inside the spacious superstructure. A logistical support ship version analog to the East-German pr.109 class was completed however. The lead ship Toivo Antikainen was completed in 1984 and her five sisters until 1990. After the end of the cold war, the program was halved, as the new defense doctrines and the fall of Warsaw Pact made their role in the strategic landings redundant.

Mine warfare had important part in the 1975 naval program as the last WWII veterans in the navy, the minelayers begun to approach the ultimate discarding age. In early on it was decided to separate amphibious operations and strategic landing-ships from the minelayer role, as the former would serve part of the General Forces and under Warsaw Pact leadership, whereas minelayers were seen more domestic role and during the advent of future conflict, it was seen paramount to keep simultaneously high alert levels for the landing forces as well as conduct the defensive and offensive mining in the Finnish waters and adjoining areas. The program authorized 3 ocean going and 6 coastal minelayers. Early on it was also decided that the first minelayer was to act as a training ship to replace the sunken Aunus. The need of the training ship was so paramount that Pohjanmaa thus became the first new ship class vessel completed from the 1975 program vessels in 1978, whereas the other components went through rather extensive evaluation progress.

The program continued in the 1980’s when studies for the new ocean going vessels were concluded. In mean time, the old Destroyer Hämeenmaa was fitted as minelayer and she kept her service until 1989. The next new build minelayer was Satakunta, in 1988 which was a dual-role support ship, with bow ramps and doors. The next two vessels were modified design from the Satakunta and featured reduced logistical and support ship capacities and they were completed as Hämeenmaa and Uusimaa in 1992 and 1993. After them, the Finnish navy fielded 4 large minelayers and the production was switched for the smaller Pansio class Mine crafts which were small coastal ro-ro freighter type vessels intended for logistical support work as well, and they also substituted the discontinued amphibious vessel programs.

In MCM role, the biggest lack was found in minesweepers capable of sweeping and hunting down magnetic, acoustic and pressure mines. To combatant these type of mines, new design solutions were needed and Finland became one of the first nations to complete GRP (Glass Reinforced Plastic) hulled MCM ships in the form of the Kuha class. Despite their design was started already during the 1958 Naval Program, the production and redevelopment was authorized in the 1975 program. They were novel crafts with their new hull material and placing their engines in rafted compartments in the upper hull to reduce the acoustic noise and pressure. Only their rather miniature size (90 tons, Also dictated by the desire of having low pressure effect) made them rather unnoticed in the larger Naval circles. They were accompanied by Kiiski class MCM boats, which were intended to be operate as drones, controlled from the Kuha class vessels. A larger follow on was planned in the 1980’s but the design work advanced slowly and didn’t materialize until long after the end of the cold war.

Biggest success and exchanged capacities for the fleet became however in the Fast Attack crafts. After the failures and misconceptions of the last program were carefully evaluated and analyzed, the new program envisioned completely new approach in the attack boat philosophy. The new vessels were to be much larger units, armed with medium caliber guns as well as missiles, and to have strong diesel only propulsion arrangement and to be easily configured for either attack boats with torpedoes and missiles, patrol boats, submarine chasers or fast minelayers. Single class of 30 ships were originally planned and the prototype was completed in 1981 featuring Wärtsilä diesel engines and Soviet made 76mm gun which was selected after trials were made along with the Novgorodian 57mm gun. The soviet weapon had the ammunition commonality with the larger twin mounts onboard the Escort ships and minelayer. Missiles were to be the Novgorodian Uran alongside their fire control radars. New Finnish made 400mm electronic torpedoes were also fielded at this time and the boats were to be armed with them as well. The prototype was named Helsinki, and thus begun the tradition of naming this type of vessels in Finnish service after the coastal towns.

Simultaneously with the Helsinki class vessels, a lot smaller fast torpedo boat prototype was build. A V-shaped hull reappeared along with new novelty, the water jet propulsion. Also first time such vessel was designed in stealth features in mind, and the then planned round shapes were featured in the Helsinki class as well, despite it proved out to be rather in effective solution. This new boat was named Isku and the operational concept of really fast attack boats were influenced by the East Germans who had built several small torpedo boat designs. Isku was originally intended to be a water jet propulsion candidate in series of tests were also Novgorodian build attack hydrofoils and hovercrafts were present. After the evaluation of all three types, the Isku class was selected as winner, since hydrofoils were deemed completely unsuited for coastal operations due their huge draft requirements when in port that prevented the tactical use of the archipelago and its skerries, as well as for their rather limited usefulness outside their fast maximum speed.
Hovercrafts were regarded much better, but since the examples of the Novgorodian Prut class were transport variants, the opportunity to use them as attack vessels were seemed too far away the capacities of the Finnish navy then. Alongside with the stunning performance of Novgorodian Desants in the 1981 Zapad war-games using dash attacks by hovercrafts, the type was accepted in limited service in its original role.

The Isku class was repeated with 6 vessels, but it was soon apparent that the modern war saw little use of small under 100 ton attack boats, compared to the larger Helsinki type vessels. But the advances in water jet propulsion was the biggest achievement of the small Isku’s and after 6 of the new Helsinki class boats were completed, it was decided to switch the production for an improved Rauma class design that featured waterjet propulsion. In addition, a near sisters of them were built for the Border Guard with limited engine output and reduced speed, but they were still regarded affordable as ASW and patrol platforms for the Navy as well, and 8 vessels were ordered of this type as well, despite the new Rauma class also retained the ASW capacity in form of the new Kaiku-14 sonar and the rather advanced Kaiku-15 variable depth towed array suite. The Uran missiles were introduced in 1985 and it was to be followed by several variants, including one with optical seekers developed by East Germans. After the end of the Cold war these plans were scrapped and in Novgorod, the production and design efforts were turned towards faster supersonic missiles launched from universal vertical launcher canisters. Finland introduced the Uran as MTO-85 and alongside its missile boats the missile was fitted onboard trucks to be used in land-launched mode. Finnish license production begun in 1989 and after series of difficulties at start, it continues till today and has fielded many improved variants.

As mentioned, the Novgorodian Pr.1305 Prut class hovercrafts were evaluated in 1979 and despite the attack hover-craft concepts were then discontinued, the vessel was seen most interesting for future studies in amphibious role and specially in the traditional archipelago warfare concepts that begun to reenter into Finnish naval planners interests as the old vessels in this role were been decommissioned. 5 additional vessels were purchased in 1980-1981 and development of domestic howercrafts begun. It was noteworthy that Finnish engineers had studied and designed these type of vessels as early as 1930’s but the WWII had prevented future contributions in this field and the concept was only slowly starting to take root in the minds of Finnish planners. The Prut’s were followed by 4 Jylhä class crafts in 1985-1989 which featured more powerful engines, a bow-ramp and MG armament. It was soon calculated however that hovercrafts, despite their unique abilities, were not cost-effective in small scale raiding landings in the Finnish waters. Their unit cost was expensive and the troop-capacity was rather mediocre to justify such high price tag. Water jets once again appeared to provide more affordable solutions, as new smaller diesels allowed fast traditional boats, made of light-alloy metals would be more mass-producible and offer all the tactical requirements needed for such operations in vast lower price than hover-crafts.
Much is speculated whether this decision was result of active lobbying of the ship and small boat building yards, since the hovercrafts were built at Halli Aircraft factories in Central-Finland.
Howercrafts were however seemed suitable for future evolution, especially when able to transport heavier equipment. Also the plans for missile armed attack hovercrafts were circulating through several of academies and design boards inside the military-industrial complex already during the last years of the cold war.

In regarding these small water-jet propelled landing crafts, the Meriuisko class vessels were essentially larger version of the land force pioneers Uisko type boats. 3 types of vessels were produced, from 1986 onward and continued in slow pace until 2010’s.

Finally, alongside with the numerous auxiliaries for fleet and local work (to be covered later) the old concept of logistical transport ferries continued in form of the Kampela class crafts, which were essentially just improved Kala class crafts build since 1950’s.

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 16th, 2015, 12:37 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
The Post cold war years and modern times 1991-

After the peaceful revolutions and political changes in East Germany, Hungary, Czechoslovakia and Poland, the Warsaw Pact basically fell out of its practical purposes in 1988-1990. Despite the Novgorodian-Finnish alliance was far longer lasting and more traditional, in practice it was so intervened into the socialist alliance block that the rather bureaucratic –prone Finnish and Novgorodian military complexes had hard time to adjust to the rapidly changing political climates. In Naval matters, this mostly meant end of joint Warsaw pact squadrons and joint strategic military planning and defense doctrines. In wake of the new political climate, Finland begun to reversing its overall military doctrine already at 1989 and this work was finally completed in 1992. In naval vise it basically ripped the Fleet from its far-reaching duties as part of the combined Warsaw Pact Baltic Fleet and re-orientated its roles for coastal defenses in Finnish waters. The huge landing ship armadas were decommissioned, as were lot most of the older ships, and the was quantities of new ships build in the 1980’s were reconfigured to more modest roles and building queues for tank landing ships and submarines were canceled, and only production remained in form of small crafts and minelayers.
Biggest factor naturally for these decisions was the falling financial situation, as Novgorod nor Soviet Union was no more capable of subsiding Finnish defense programs and all had to be funded from national assets and budgets.

1990s specially proved out to be difficult for the navy. Lot of ships were decommissioned without any sign of getting replacements, and this hit hardest on the ASW and escort capacities of the fleet. And when the submarine and landingship construction was suspended, the emphasis of the fleet begun to focus on small missile boats, where the fleet was able to enjoy the succesfull and competent Helsinki class boats as well as introducing the more modern Rauma class vessels in leisure pace to the fleet. Apart from their near sister Kiisla class, they were sole combatant vessels that joined the fleet between 1991 and 2001.

After the Finnish economy begun to revival in late 1990s and the new model socialist state had managed to forge its continuity inside the society, Finnish defense expenditures begun to once again increase and new acquisitions became possible for the Navy as well. A new naval program called the Fleet 2000 plan, was set up in late 90’s and its role was to investigate the new roles and capacities for the navy in the new millennium and reconstruct the fleet to match the new security environment. Despite the tensions between NATO and Finland had dramatically reduced, the re-emerging Novgorodian status increased the NATOs presence and interest for the Baltic, especially as the German reunification and Polish NATO membership had switched the power stability strongly into NATOs favor. These factors begun to show in increased activity in Finno-Novgorodian relationships which once again begun to take shape and roles of proper military alliance. Plans for joint Baltic operational Center was begun and these lead into creation of jointly operated shipping monitor and surveillance system that covers the entire Baltic Sea. Annual war games and joint cruises were restarted in 2002 and despite being of smaller scale than in Cold War years, they presented the continuity of the Finno-Novgorodian naval relations in the Baltic.

The Fleet 2000 Plan saw the Finnish navy’s main task to be defending its maritime area, reaches and interest, which were specified as ability to deny enemy sea operations in Finnish waters and their immediate proximity, ability to protect coastal shipping and mercantile traffic, protect and ensure the sea to remain open as link to communication and support from allied nations and be able to fulfill the security commitments that Finnish Military alliances dictated.
The basic structure of the Navy remained as it had been since 1949, General Forces covering the main attack units, Local forces consisting the mine warfare and local patrol roles and to support the shore based coastal artillery branch, which was being transformed into mobile missile based force.

The General Forces would consist the submarines, the escort ships and the Fast Attack Crafts. Fast attack crafts were structured around the new Squadron 2000 concept, where a goal was to set to have 3 operational missile boat squadrons, one with Helsinki class boats, one with Rauma class and third to be built around the concept of Hamina class Missile boats and Tuuli class Missile Hovercrafts. Gradually all the squadrons would be of this new format where the Missile boats would act as leaders and Air defense vessels and the Hovercrafts would provide the fast and flexibility to operate in environment where traditional boats could not. The Hamina class vessels where modern version out of the Rauma class, featuring Stealth technologies and powerful radar suite and possibility for launching medium range SAM (as far as 2015 the system is still under consideration). They share their predecessor’s water jet propulsion, but have re-introduced the 76mm guns, of which were purchased from China as first of such in the history of Finnish defense acquisitions. Rumored missile deals from china were not true and the class is fitted with Uran SSMs with their new Finnish made versions which allows either ARM or Electro-Optical seekers.

The Tuuli class hovercrafts were designed from the Jymy class LCAC boats which were designed first as a private venture to be exported to Novgorod but later adopted For Finnish service. They resembled the USN hovercrafts in arrangement. Tuuli class vessels are armed with the EO version of the Uran missiles and are in due course to be armed with the new vertically launched SAM system.

Submarine construction was resumed and after lengthy evaluation phase, the Iku-Turso class submarines were ordered in 2010 and are currently introduced into the fleet. During their design, lot of new Novgordodian technologies were acquired and it was noteworthy that the Pyöriäinen class boats all had their mid-life upgrades done in Leningrad instead of Finnish yards, which was first of such occasion in the history of Finnish navy. No details have been revealed of this refit and what possible technologies were acquired. Together with the modernized Pyöriäinen class and with the new Iku-Turso class which is rumored to field AIP propulsion and underwater launched missiles, the Finnish navy’s capacities have reached great boost in terms of range and reachability, and currently the Finnish coastal submarine force is one of the strongest in Baltic.

In case of larger surface combatants, the Fleet 2000 plan foresaw new multipurpose combatants which could cover all the needs that a ship sized vessels needs to perform in Finnish defense doctrines. In meanwhile the Otto W Kuusinen class Escorts were modernized for more multipurpose role and after the decommissioning of the Turunmaa class, the Hämeenmaa class minelayers were refitted to act as intermediate escorts and are also scheduled to field the new VLS SAM system. New constructions are scheduled in 2020 in terms of the MTA2020 or “multipurpose ship 2020” which is thought to be a similar vessel to the Danish Absalon class in terms of capacities and roles.

In MCM roles, the new Katanpää class vessels have finally allowed the navy to retire its old Suursaari class vessels which had almost forty year long service in the Navy. The Katanpää’s are modern GRP hulled minehunters that have facilities for divers, capacity to operate AUV and ROV type of underwater drones and has sonars as well as traditional mechanical sweeping equipment. They are also planned to replace the Kuha/Kiiski class vessels.

The amphibious roles have once again orientated towards smaller scale assaults and maintaining the capacity to contest the enemy in the archipelago inside the concept of the flexible shore defense, where the naval infantry poses roles of defending the shore as well as attacking on it. The large Toivo Antikainen class was retained mostly due their versatility to act as logistical support vessels, but also because the Navy still feels the need to maintain the more strategic landing tradition and capacities, this meaning basicly as response capacity to counter land troops to Ahvenanmaa or re-invading the Islands if they have fell for enemy during the war time.

In the more local work, the Jurmo class water-jet powered assault boats were kept in production and the latest models had enclosed troop compartments as well as firesupport versions with turrets from Land forces AIFV chassis mortar’s, echoing the use of the armored patrol boats of the 1950’s. A new larger Jehu class vessels are being commissioned which also serve as patrol boats.

As mentioned, the hovercraft enthusiasms continued in Finland, and in 1998 Valmet build an one-off example for Novgorod, which was evaluated but not accepted (for political reasons) but later returned to Finland and commissioned in Finnish navy as Jymy. Three more were ordered after successful trials and there are plans for more advanced hovercraft landing vessels for future as well.

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 16th, 2015, 12:40 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Gollevainen
Post subject: Re: Finnish AU (Part III)Posted: March 16th, 2015, 12:43 pm
Offline
User avatar
Posts: 4714
Joined: July 27th, 2010, 5:10 am
Location: Finland
Contact: Website
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]
[ img ]

_________________
Shipbucket mainsite, aka "The Archive"
New AU project "Aravala"


Top
[Profile] [Quote]
Display: Sort by: Direction:
[Post Reply]  Page 6 of 24  [ 238 posts ]  Return to “Alternate Universe Designs” | Go to page « 14 5 6 7 824 »

Jump to: 

Who is online

Users browsing this forum: No registered users and 13 guests


The team | Delete all board cookies | All times are UTC


cron
Powered by phpBB® Forum Software © phpBB Limited
[ GZIP: Off ]