A little something I've been working on.
A replacement for New Cromer's Oceanic Class Assault Carrier, the Oceanic class carriers were only designed to last 20 or so years and were built to merchant standards, so new ships have been in the pipe line since the mid to late 90's. Due to enter service in 2019, based on Italy's Cavour with a UK en spired radar fit based on New Cromer's Own CVN's. they have facilities to handle full LPH tasks and as small CV's when equipped with the F35B. they have landing craft which will be salvaged off of the Oceanic's, they have full vehicle facilities with rear and side ramp. Accomidation for up to 800 marines, and full flag ship facilities. Powered by 4 Gas Turbines with a top speed of approx. 30knots. The ships will be built in New Cromer with some components brought in from the UK, Italy and US.
Air wing setup will be as follows. Although all are completely adaptable.
CV :- 14 F35B, 7 Merlin (3 HAS, 2 HC and 2 HAR), 3 V22 (1 KC and 2 AEW). A Merlin HC can be swapped for an additional tanker V22, alternatively tanker capability can be sacrificed for 2 additional Merlin HAS, for additional ASW capability.
ASW :- 10 F35B, 14 Merlin (10 HAS, 2 HAR and 2 HC), 2 V-22 AEW.
LPH/Commando :- 5 F35B, 2 V22 (1 KC and 1 AEW), 4 CH47F, 10 Merlin (2 HAS, 2 HAR and 6 HC), 8 Tiger UHT.
LPH/Amphibious :- 2 CH 47F, 6 Merlin HC, 8 Tiger UHT, Rear half of hangar used for vehicles and equipment and using deck edge lift for access to rear of flight deck for additional parking, forward lift and half of hangar used for air craft handling. These ships are not LPD's and would therefor need a port to off load heavy vehicles, light vehicles could be loaded onto LCU Mk10 carried by other members of a task force and loaded/offloaded from the side or rear ramp onto or Off Mexifload rafts. Air group could be increased at the expense of vehicle space.