I'd do the following to the second one:
- Drop the second VLS down to the main deck
-
Reduce the size of the superstructure
-
Enlarge the hanger in the now smaller superstructure
-
Add a split VLS outside of the landing areas aft
-
Ditch the Harpoon launchers - if you really want Harpoons, just say that the full VLS units were finished and deployed
-
Add SM-2MR/ER, Right now you've got CIWS (RAM), Self defense (ESSM), and theatre ABM (SM-3), with nothing between the last two.
Droped the second VLS to the main deck.
Reduced the size off the superstructure with one deck.
The hangar is now halfway under the bridge superstructure. there is also a workshop there. it is also an large hangar under the helicopter deck for storage and repair of helicopters.
Split VLS outside of the landing area aft, owered a half a deck, to get the weight down as far as possible.
Harpoon in VLS
Added SM-2MR/ER
added extra barges where the other VLS was placed before.
for me the ship begins to looks like a commando carrier or an amphibious assault carrier.
wonder how many men I have in her, and how large task force she can take, (I think for her style she should carry more of a special force).